Top Navigation

Current Status

The 2014 Mineral Resource Estimate is based on a combination of validated historical drilling and the 96 Rotary Mud and Diamond holes drilled by Paladin.

The geology of the deposit is well understood, having been subject to extensive exploration over a number of years. The stratigraphic sequence within the deposit has been defined from the extensive dataset of downhole electric logs. A total of 35 water bores were installed in 2012, which are used for monitoring of physical and chemical properties of the aquifer containing the uranium mineralisation. Paladin believes that the Mineral Resources on the mining leases can be increased and that commencement of production at the project can be achieved in a 4-5 year time frame.Due to uranium market and political conditions the project is maintained on a care and maintenance basis.

Latest prices

ASX A$ 0.18

Latest Prices

TradeTech U3O8 spot US$20.40/lb
TradeTech U3O8 long term US$34.00/lb

Contact Paladin

Subscribe

Newsletter form

SIGN UP TO OUR NEWSLETTER

First Name
Last Name
Email Address