2009 EIA Report

The Stage 3 expansion of LHM to expand production from 3.7Mlb pa to 5.2Mlb pa was completed in 2012. The main components of the expansion project included: an increase in the rate of mining, a new satellite mine workshop, the expansion of the existing processing plant, a new satellite crushing plant, a heap leach pad, modifications to tailings management, a temporary contractor’s camp, additional power supply to the water abstraction boreholes located in the Swakop River, and additional support infrastructure and services.

Prior to the commencement of the expansion project, an environmental impact assessment (EIA) report was required to be submitted and approved by the Directorate of Environmental Affairs. The draft EIA regulations (April 2009) have been used as a guideline for this EIA process and report.

(Please allow time for files to download as some files are quite large)

Latest prices

ASX A$ 0.0470
TSX C$ 0.0000

Latest Prices

TradeTech U3O8 spot US$20.40/lb
TradeTech U3O8 long term US$34.00/lb

Contact Paladin

Subscribe

SIGN UP TO OUR NEWSLETTER

First Name
First Name
Email Address