Top Navigation

Abbreviations

A$ Australian dollars m metres
bcm bank cubic metres Ma million years
BFS bankable feasibility study MIK multiple indicator kriging
CCD counter current decantation mm millimetres
DFS definitive feasibility study MMI mobile metal ion
DIFR disabling incident frequency rate mSv millisiverts
FLT field leach trial Mtpa million tonnes per annum
ft feet NI 43-101 National Instrument 43-101 - Standards of Disclosure for
Mineral Projects
of the Canadian Securities Administrators
g gram
g/m3 grams per cubic metre
g/t grams per tonne NOSA National Occupational Safety Association
hr hours NPV net present value
ISO International Standards for
Standardisation
OK ordinary kriging
pa per annum
ISR in situ recovery PAL Paladin (Africa) Limited
JORC Joint Ore Reserves Committee PFS pre-feasibility study
K thousand ppb parts per billion
kg kilogram ppm parts per million
kg/t kilogram per tonne QAQC quality assurance and quality control
km kilometres QC quality control
KM Kayelekera Mine RC reverse circulation
km2 square kilometres RIP resin-in-pulp
kW kilowatts t tonnes
lb pounds t/m3 tonnes per cubic metre
LHM Langer Heinrich Mine tpa tonnes per annum
LHUPL Langer Heinrich Uranium
(Pty) Ltd
tph tonnes per hour
LTI lost time injury U uranium
LTIFR lost time injury frequency rate U3O8 uranium oxide
M million US$ US dollars
Mlb million pounds w:o waste to ore ratio

Latest prices

ASX A$ 0.0590
TSX C$ 0.0600

Latest Prices

TradeTech U3O8 spot US$21.35/lb
TradeTech U3O8 long term US$35.00/lb

Contact Paladin

Subscribe

SIGN UP TO OUR NEWSLETTER

First Name
First Name
Email Address